Skip to content

Commercial workplace interiors across Arkansas, North Texas, and Louisiana

800-530-7445[email protected]

Architectural interiors / Entries

Doors, Frames & Hardware

Treat the entrance as part of the wall assembly. Door motion, leaf construction, frame, pull or lever, locking, accessibility and room function need to be resolved together.

Motion Compare sliding, pivot and hinged approaches against the plan.
Leaf Review glass, framed glass, solid and glass-insert choices by system.
Hardware Coordinate pulls, levers, locking and closer options with use.
Compliance Verify accessibility, egress and any rating requirement with the project team.
Start with the opening

Three decisions that shape the entry

The best-looking door is not the right door if its motion, hardware or required clearances conflict with the room and circulation plan.

Door motion

Sliding, pivot or hinged

Review approach space, swing or slide path, adjacent furniture, corridor conditions and the user experience before choosing a type.

Leaf & frame

Glass, solid or combined

Select the visual relationship to the wall, then confirm the leaf and frame are available together in the chosen system.

Hardware & access

Pulls, levers, locks and closers

Translate room use and access needs into a hardware review. Final selections must follow project specifications and applicable requirements.

Partially open sliding door with glass insert in a solid architectural wall
Door-schedule checklist

Bring the room and hardware requirements together

A useful early review identifies the opening, door behavior and project criteria without assuming that every architectural-wall door satisfies every requirement.

  • Room name, opening location and circulation condition
  • Sliding, pivot or hinged preference and available path
  • Glass, framed glass, solid or glass-insert leaf intent
  • Pull, lever, locking, closer and access-control needs
  • Accessibility, egress, fire-rating or other criteria from the design team
From opening to coordinated entry

A practical planning sequence

01

Identify the room

Start with room use, circulation, opening size and any project-specified requirements.

02

Select motion and leaf

Compare sliding, pivot and hinged paths, then review compatible glass or solid leaves.

03

Coordinate hardware

Review pulls, levers, locks, closers and access-control interfaces against the specification.

04

Verify the assembly

Confirm wall pairing, frame, current technical data, field conditions and trade responsibilities.

Buyer questions

Door, frame and hardware FAQs

Which takes less floor area: a sliding or swing door?

A sliding door avoids a conventional swing arc, but it still needs a clear slide path and compatible wall, rail and hardware conditions. Compare the full plan rather than choosing by door label alone.

Can we use glass or solid doors in the same wall system?

Selected Teknion programs document glass, framed glass, solid and glass-insert options. Not every leaf is available with every frame, motion type or wall program, so confirm the exact combination.

Are locking and access-control options available?

They must be confirmed for the selected assembly. Product guides list system-specific pulls, handles and related door components, but do not establish blanket compatibility with arbitrary locks or access-control hardware. Electrified hardware, power and trade coordination require project-specific review.

Does an architectural-wall door meet fire, egress or accessibility requirements?

Do not assume it does. Those requirements depend on the opening, occupancy, hardware, clearances and tested or listed assembly. The project architect and code team must define the requirement; Pettus can then help identify a matching product path.

Plan with Pettus

Coordinate every entry with the wall and the room

Share the plan, door schedule and project criteria. Pettus can help compare documented door, frame and hardware combinations before scope is finalized.