Facilities & workplace operations

Keep the workplace operational from project planning through punch list.

Pettus helps facilities and workplace teams coordinate furniture, architectural interiors, site conditions, warehousing, delivery, installation, final corrections, warranty, and future changes.

Occupied and phased workSite-readiness reviewPost-installation responsibility
Site readinessAccess · Loading · Staging · Construction
Operational continuityPhasing · Protection · Work hours
Installation controlDelivery · Assembly · Placement · Cleanup
After installationPunch list · Warranty · Moves · Changes

Operational ownership

Facilities should not inherit unresolved furniture problems.

The workplace must remain usable after the project team, contractor, and installation crew leave. That requires clear responsibility for field conditions, access, installation, final corrections, warranty, and continuing service.

Before delivery

Site conditions

Access, loading, elevators, staging, floor protection, construction completion, field dimensions, power, data, and work-area availability.

During work

Occupied operations

Phasing, off-hours installation, employee circulation, safety, protection, communication, noise, cleanup, and operational continuity.

After installation

Continuing responsibility

Punch list, warranty, parts, replacements, additions, moves, reconfiguration, and future furniture standards.

Freestanding visitor check-in and sanitation station in a workplace lobby.

Facilities sees the operating conditions

Every finished setting creates an ongoing operational responsibility.

The furniture plan has to agree with the real building: dimensions, doors, corridors, elevators, loading, electrical, data, ceilings, floors, construction sequence, access, and the way employees need to keep working.

  • Occupied and phased installation planning
  • Access, loading, elevators, staging, and protection
  • Power, data, dimensions, and field verification
  • Post-installation service and future change

Questions to resolve early

Installation readiness is a set of verifiable conditions.

Building

Is the site physically ready?

Construction completion, flooring, ceilings, walls, power, data, HVAC, doors, access paths, elevators, loading, and staging areas.

People

Can operations absorb the work?

Occupancy, phasing, work hours, employee communication, temporary moves, protection, safety, noise, and cleanup.

Responsibility

Who owns each prerequisite?

Approvals, changes, field decisions, access, security, permits, removals, technology, final corrections, and acceptance.

Operational readiness

Make the installation conditions visible before crews arrive.

01 · REVIEW

Inspect project conditions.

Confirm plans, access, building rules, construction status, field conditions, employee impact, and target dates.

02 · PLAN

Build the operational sequence.

Define staging, phasing, work hours, site protection, removals, deliveries, installation zones, and communication.

03 · EXECUTE

Control the live installation.

Coordinate product flow, crews, placement, adjustments, cleanup, issue documentation, and daily handoffs.

04 · CLOSE

Resolve and support.

Complete punch list, warranty, acceptance, additions, and future moves or changes.

Facilities request

Request a site and installation-readiness review.

Share the operational facts that matter. Pettus can identify which details still need verification before delivery or installation.

  • Occupied, unoccupied, or phased conditions
  • Access, loading, elevator, staging, and work-hour constraints
  • Construction, power, data, and field-readiness questions
  • Punch-list, warranty, move, addition, or change support

← Back

Thank you for your response. ✨

Common questions

Questions facilities teams ask before installation.

Can Pettus work in an occupied office?
Yes. The project should define phasing, employee impact, access, installation windows, protection, removals, temporary conditions, and communication before work begins.
Who is responsible for site readiness?
Responsibilities should be documented for each project. Pettus can identify installation prerequisites and coordinate with the owner, facilities team, contractor, design team, technology team, and other stakeholders.
Can Pettus warehouse furniture until the site is ready?
Pettus can coordinate warehousing when project timing, construction completion, phased occupancy, or shipment sequencing requires it.
Does Pettus support moves, additions, and changes?
Yes. Pettus can support reconfiguration, additions, moves, parts, warranty needs, replacements, and future furniture standards.

Facilities should not inherit unresolved furniture problems.

Bring the current plans, schedule, building rules, and operational concerns. Pettus can help define the readiness path.