Delivery · Installation · Continuing support

Carry the approved furniture plan into a workplace ready to use.

Pettus coordinates warehousing, site readiness, access, delivery, installation, final corrections, warranty, moves, additions, and changes through regional project teams.

Site-readiness planningOccupied and phased workSupport after installation
PrepareAccess · Schedule · Site conditions
ReceiveTracking · Warehousing · Staging
InstallAssembly · Placement · Adjustment
Close & supportPunch list · Warranty · Changes

Execution begins before delivery day

Installation begins before the truck arrives.

The furniture, building, site, schedule, access, staging, technology, construction, employees, and installation crews must be coordinated before the delivery window.

Readiness

Site conditions

Access, loading, elevators, security, staging, floor protection, construction completion, field dimensions, power, data, and work-area availability.

Logistics

Warehousing and staging

Track shipments, receive, inspect, hold, sequence, stage, and release furniture when timing or phased work requires control.

Installation

Delivery and field execution

Scheduling, crews, assembly, placement, adjustment, occupied work, protection, cleanup, issue documentation, and trade coordination.

Closeout

Punch list and warranty

Walkthrough, final corrections, damage or shortage resolution, documentation, warranty, parts, replacements, additions, and changes.

Define responsibility early

The installation window is not the time to discover missing prerequisites.

A clear execution plan identifies what must be ready, who approves changes, how products arrive, where they are staged, how occupied areas are protected, and who owns final corrections.

  • New construction and new-office installations
  • Relocations, expansions, and phased openings
  • Occupied renovations and off-hours work
  • Multi-location standards, moves, additions, and changes
  • Warehousing, staged release, and schedule recovery
Mobile workplace storage positioned beside a worktable.

Readiness controls

Verify the conditions that control delivery and installation.

Building

Physical readiness

Construction, floors, walls, ceilings, doors, power, data, HVAC, elevators, loading, security, staging, and protection.

Scope

Products and responsibilities

Approved products, quantities, changes, shortages, removals, reused furniture, installer scope, technology, acceptance, and escalation.

Operations

People, phasing, and communication

Occupancy, work hours, employee movement, zone releases, temporary conditions, safety, cleanup, daily handoffs, and move-in.

Execution sequence

Four controlled stages from preparation through continuing support.

01 · PREPARE

Review the live conditions.

Schedule, access, building rules, construction, field conditions, technology, staging, occupancy, responsibilities, and risks.

02 · RECEIVE

Control product flow.

Tracking, receipt, inspection, shortage or damage documentation, warehousing, staging, sequencing, and release.

03 · INSTALL

Execute the approved plan.

Delivery, assembly, placement, adjustment, protection, cleanup, issue escalation, field decisions, and daily coordination.

04 · CLOSE

Correct and continue.

Walkthrough, punch list, final correction, acceptance, warranty, parts, replacements, additions, moves, and changes.

Common questions

Questions project and facilities teams ask before delivery.

Can Pettus warehouse furniture?
Pettus can coordinate warehousing when production, construction, project phasing, shipment timing, relocation, or site readiness requires it.
Can Pettus install in an occupied workplace?
Yes. The plan should define work zones, phasing, hours, access, employee communication, safety, protection, noise, cleanup, removals, and temporary conditions.
Who is responsible for site readiness?
Responsibility should be documented for each prerequisite. Pettus can identify furniture-installation requirements and coordinate with the owner, facilities, contractor, design, technology, security, and building teams.
What happens after installation?
Pettus can coordinate walkthroughs, punch-list items, warranty needs, parts, replacements, additions, moves, reconfiguration, and continuing service.

Share the site, schedule, access, and installation conditions.

Pettus can help define the execution path before the delivery window becomes fixed.