Skip to content

Commercial workplace interiors across Arkansas, North Texas, and Louisiana

800-530-7445[email protected]

Healthcare · North Little Rock, Arkansas

Baptist Health General Medical Education Building

Pettus scope: Complete furniture and interior-furnishings project across the approximately 160,000-square-foot medical education building.

Complete furniture scopeMulti-environment coordinationProject-wide delivery and installation
Approximately 160,000 sq. ft.Published project scale
Complete furniture projectPettus scope
Medical educationTeaching · Residents · Caregivers
Whole-building executionCoordination · Delivery · Installation

The assignment

Coordinate a complete furniture strategy across a multi-environment healthcare education building.

The building required different settings for residents, caregivers, educators, administrators, visitors, meetings, learning, focused work, collaboration, respite, and support. Pettus’s responsibility was the complete furniture and interior-furnishings scope—not an isolated product package.

  • Whole-building application development across varied room types
  • Product, finish, quantity, accessory, and performance coordination
  • Project-wide logistics, delivery, installation, and final correction
  • Continuing responsibility for warranty and future needs
Collaborative medical education furniture environment at Baptist Health

Installed environments

A furniture strategy spanning learning, work, meeting, welcome, and support.

Project scope

Complete furniture and interior-furnishings responsibility.

Applications

Different environments, one project strategy

Teaching, caregiver, resident, conference, lounge, welcome, focused work, collaboration, administrative, and support applications.

Coordination

Products, finishes, quantities, and interfaces

Furniture selection, material coordination, accessories, performance requirements, plans, approvals, delivery conditions, and installation readiness.

Execution

Logistics through final correction

Project tracking, warehousing or staging as required, delivery, installation, adjustment, walkthrough, final items, warranty, and continuing support.

What this project demonstrates

Whole-building furniture coordination across healthcare and medical education.

Breadth

Multiple user groups and room types

One furniture strategy had to support residents, caregivers, educators, administrators, visitors, meetings, study, collaboration, respite, and support.

Continuity

Consistent project decisions

Products, materials, finishes, applications, logistics, and installation needed to remain coherent across the building.

Accountability

Complete furnishing responsibility

Pettus’s confirmed scope covers the complete furniture and interior-furnishings project, with the architecture and construction credited separately.

Published context and credits

The broader project involved additional design and construction partners.

This case study describes Pettus’s confirmed furniture role and uses published Baptist Health and Kimball project information. It does not attribute the building architecture, engineering, construction, or healthcare program to Pettus.

Relevant buyer profiles

Healthcare leadership, facilities, design, procurement, and medical education.

This evidence is most relevant when evaluating a complete multi-environment furniture scope with project-wide logistics and installation.

Planning a complete healthcare or medical-education furnishing project?

Share the project stage, environments, location, purchasing path, and required opening date.