Bank OZK at 23Springs

Pettus completed the architectural glass-wall work for Bank OZK at 23Springs in Dallas. The workplace covers approximately 200,000 square feet across four floors.

Four-floor coordinationGlass-front offices and meeting roomsField verification and installation
Dallas, Texas23Springs workplace
Approximately 200,000 sq. ft.Published project scale
Four floorsMulti-level coordination
Architectural glass wallsArchitectural glass walls

Our work

Carry glass-front offices and meeting rooms through multi-floor coordination and installation.

Pettus completed the architectural glass-wall work across four floors, including glass fronts, doors, clearances, field coordination, delivery, and installation.

  • Glass-front private offices and meeting rooms
  • Doors, frames, hardware, clearances, and visual transitions
  • Ceilings, floors, conventional construction, technology, and furniture interfaces
  • Field verification, approvals, delivery, sequencing, installation, and final adjustment
Open workplace corridor with wood cabinetry and collaborative seating.

Architectural glass-wall evidence

Glass, doors, clearances, and adjacent conditions operating as one workplace system.

Multi-floor coordination

Architectural glass coordination across the workplace.

Space

Glass-front environments

Private offices and meeting rooms designed to preserve light, visual connection, privacy, circulation, and the approved material direction.

Interfaces

Doors, ceilings, floors, and technology

Hardware, clearances, conventional construction, field dimensions, adjacent furniture, power, data, displays, lighting, and controls.

Execution

Documentation through final adjustment

Submittals, approvals, field verification, sequencing, production, delivery, installation, punch list, warranty, and future change.

What the work required

Glass fronts, doors, and field conditions working together.

Integration

Glass within a complete environment

Wall locations, doors, circulation, furniture, technology, ceilings, floors, privacy, and acoustics were connected conditions.

Scale

Four-floor project coordination

Applications, documentation, field conditions, delivery, sequencing, installation, and final adjustment had to remain consistent across floors.

Execution

Field responsibility through installation

Pettus carried the approved glass-wall package through verification, production, delivery, installation, correction, warranty, and support.

Clear coordination

Glass walls coordinated with the surrounding workplace

Pettus coordinated the architectural glass walls with the approved plans, field conditions, doors, hardware, adjacent construction, furniture, power, data, displays, and lighting.

Project details

Pettus completed the architectural glass-wall work shown here across the four-floor 23Springs workplace.

Planning architectural glass fronts, offices, or meeting rooms?

Share the current plan, project stage, design criteria, interfaces, location, and required date.